Volume 24, Number 4 (IJIEPM 2014)                   IJIEPM 2014, 24(4): 476-488 | Back to browse issues page


XML Persian Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Zare Mehrjerdi Y, Ghasemi Gahvan A A, Shahmohammadi M. A bi-criterion hybrid flow shop time scheduling: Balancing the performance and total completion times . IJIEPM. 2014; 24 (4) :476-488
URL: http://ijiepm.iust.ac.ir/article-1-408-en.html

Assistant Professor yazd University , yazm2000@yahoo.com
Abstract:   (4300 Views)
Today, the flow shop environment is the most customary production area in industry. But, the need to increase the capacity or the capacity balance in different production processes has caused that in some working stations there exists more than one machine. This type of flow shops are usually named hybrid flow shop, multi processes flow shop, flexible flow shop or flow shop with parallel machines. In this article, the time scheduling of hybrid flow shop with the assumption of machine similarity is studied using a bi-criterion programming problem. Taking the fact that the proposed problem is an NP-hard type problem a genetic algorithm is developed and a sample problem is solved for illustration purposes.
Full-Text [PDF 1019 kb]   (1494 Downloads)    
Type of Study: Research | Subject: Production Planning & Control
Received: 2010/10/20 | Accepted: 2014/02/2 | Published: 2014/02/2

Add your comments about this article : Your username or email:
Write the security code in the box

Send email to the article author


© 2015 All Rights Reserved | International Journal of Industrial Engineering & Production Management

Designed & Developed by : Yektaweb